Environmental Impact Statement (EIS)
An Environmental Impact Statement (EIS) is prepared as part of State Environmental Policy Act (SEPA) review of a proposal when it has been determined by the lead agency that the proposal is likely to have significant adverse environmental impacts. The EIS process is a tool for identifying and analyzing probable adverse environmental impacts, reasonable alternatives, and possible mitigation. For more information about SEPA, visit the Washington State Department of Ecology's SEPA Unit page.
First a draft EIS, and then a final EIS were prepared in association with review of the proposed Brinnon MPR. The EIS contains characteristics of both a "non-project action" (such as legislative adoption of a plan) and a "project action" (such as administrative approval of new construction) under SEPA.
An extended public comment period opened when the Draft EIS (DEIS) was published on September 5, and comments were accepted until 4:30 p.m. on October 24. The Final EIS (FEIS) incorporates all public comments, as well as responses from the applicant.
Both the draft and final EIS documents address 9 issues and impacts including:
Some duplication is to be expected, as the documents are intimately linked. Cross-referencing is ubiquitous throughout the FEIS, and should make navigating between the two documents easier. For changes between the DEIS and the FEIS, please note especially the Introduction, Chapter 3, Chapter 5 (new since the DEIS), and the public comment logs (also new since the DEIS):
First a draft EIS, and then a final EIS were prepared in association with review of the proposed Brinnon MPR. The EIS contains characteristics of both a "non-project action" (such as legislative adoption of a plan) and a "project action" (such as administrative approval of new construction) under SEPA.
EIS Scoping for Proposed Brinnon (MPR)
- DCD EIS Scoping Letter to Proponent (PDF) June 13, 2006 - outlines scope of EIS based on staff analysis and public scoping comments
- Video of Public Hearing May 8, 2006
- Scoping Notice: EIS for MLA06-87 (PDF) published April 19, 2006
- Press Release: EIS Scoping for Proposed Brinnon MPR (PDF) April 13, 2006
An extended public comment period opened when the Draft EIS (DEIS) was published on September 5, and comments were accepted until 4:30 p.m. on October 24. The Final EIS (FEIS) incorporates all public comments, as well as responses from the applicant.
Draft Environmental Impact Statement (DEIS)
Public Comment: Release of the Draft Environmental Impact Statement (DEIS) on September 5, 2007 opened a public comment period:- Oral comments were heard at the Planning Commission public hearing 6:30 p.m. Wednesday, October 3, 2007 at the Brinnon Community Center
- Written comments were accepted by DCD on behalf of the Planning Commission until 4:30 p.m., Wednesday, October 24, 2007
Both the draft and final EIS documents address 9 issues and impacts including:
- Shellfish
- Water quality
- Transportation
- Public services
- Shorelines
- Fish and wildlife
- Rural character
- Critical areas
Some duplication is to be expected, as the documents are intimately linked. Cross-referencing is ubiquitous throughout the FEIS, and should make navigating between the two documents easier. For changes between the DEIS and the FEIS, please note especially the Introduction, Chapter 3, Chapter 5 (new since the DEIS), and the public comment logs (also new since the DEIS):
Brinnon MPR Final EIS Volume 1
- Cover Page (Final) (PDF)
- Introduction and Table of Contents (Final) (PDF)
- Chapter 1 - The Proposal (Final) (PDF)
- Chapter 2 - The Physical Setting (Final) (PDF)
- Chapter 3 - Adverse Impacts Review, Pages 1-35 (Final) (PDF)
- Chapter 3 - Adverse Impacts Review, Pages 36-end (Final) (PDF)
- Chapter 4 - Alternatives (Final) (PDF)
- Chapter 5 - FEIS Mitigating Conditions (Final) (PDF)
- Public Comment Matrix (Issues and Responses) (Final) (PDF)
- Technical Reports (Final) (PDF)
Brinnon MPR Draft EIS Volume 1
Brinnon MPR Draft EIS Volume 2 - Appendices (also
- Appendices Cover Page (Draft) (PDF)
- Appendix 1 - Historic Reference Site Plan (Draft) (PDF)
- Appendix 2 - Marina Impact Analysis (Draft) (PDF)
- Appendix 3 - Shoreline Characterization (Draft) (PDF)
- Appendix 4 - Soils and Geology Evaluation (Draft) (PDF)
- Appendix 5 - Water Supply and Groundwater Impacts Analysis (Draft) (PDF)
- Appendix 6 - Transportation Impact Study (Draft) (PDF)
- Appendix 7 - Fish and Wildlife Habitat Assessment (Draft) (PDF)
- Appendix 8 - Cultural Resource Assessment (Draft) (PDF)
- Appendix 9 - Wetland Delineation (Draft) (PDF)
- Appendix 10 - Example of Notice to Mariners for Restricted Closed Areas of Dabob Bay (Draft) (PDF)
- King County Best Management Practices for Golf Course Development and Operation (Draft) (PDF)
2007 Brinnon MPR Public Comments
All of the documents relating to this issue are stored in an archiving program we use called "Laserfiche." You may view the files stored in Laserfiche by following the instructions below:- Open the Laserfiche WebLink
- Click on "Community Development"
- Click on "Long Range Planning"
- Click on "Pleasant Harbor MPR - Statesman"
- Click on "2007 Brinnon MPR Public Comments"
- Click on "Log List 001-403" to see the Log Number and the author of each communication
- To view a specific communication, go back to the main folder and click on the corresponding Log Number